HEAVYLIFT FLOATING CRANE & OFFSHORE OPERATIONS IN THE CASPIAN
ENGLISHRUSSIAN

About other Marine Operations


In addition to positioning and installation the two ice-resistant stationary platforms LSP-1 and LSP-2 on the Caspian shelf  the Company has also successfully conducted  the following offshore operations:

  • Installation of two technology platforms LAM-A on the shelf of Turkmenistan;
  • Pile driving for the spot marine oil terminal on the shelf of Turkmenistan;
  • Handling constructions and equipment drilling platform LAM-22 in Astrakhan, installation of constructions and piling on the shelf of Turkmenistan;
  • Handling of the large-sized and heavy-lift objects at the port of Aktau;
  • Rearrange platform and installation the Block 2 for the company NCG (Dragon Oil);
  • Handling equipments at the port Cheleken and subsequent loading on the platform LAM-22 for the company MOS;

   

 

   

   





 





© 2012, Crane Marine Contractor Ltd.
Contacts.

Site created by — Bilingo.ru studio